Chestnut Street

Project Details

The multi-phase reconstruction project consists of replacement of curbs, sidewalks, asphalt paving, storm sewer, sanitary sewer, and water main on Chestnut Street from Front Street to Tenth Street including a section of Raspberry Avenue and South River Street. A new traffic signal was designed at the intersection of Chestnut Street and S. Second Street. The project was developed for the reconstruction of the street while separating the storm and sanitary sewer system and addressing flooding concerns.

Responsibilities

Assisted in Grant and Funding Applications
Survey
Mapping Control
Permitting
Construction Stakeout
Base Mapping
Courthouse Research
Utility Coordination
Streetscape Design
Erosion & Sedimentation Control Design
Wastewater Collection Design
Water Distribution Design
Stormwater Collection System Design
Construction Inspection and Management
Bidding Administration

Owner

City of Sunbury, Northumberland County, PA

Project type

Street Reconstruction

The multi-phase reconstruction project consists of replacement of curbs, sidewalks, asphalt paving, storm sewer, sanitary sewer, and water main on Chestnut Street from Front Street to Tenth Street including a section of Raspberry Avenue and South River Street. A new traffic signal was designed at the intersection of Chestnut Street and S. Second Street. The project was developed for the reconstruction of the street while separating the storm and sanitary sewer system and addressing flooding concerns.